INSTRUCTIONS FOR DISRAT,SAVING,TRUINT,GROWTH,ANNUIT,CPM DISRAT ------ PURPOSE: TO CALCULATE THE DISCOUNTED RATE OF RETURN(PERIOD AND CONTINUOUS), THE DOUBLE-LIFE, AND THE PAYBACK PERIOD FOR A SEQUENCE OF CASH FLOWS INSTRUCTIONS: TO USE THE PROGRAM , ENTER INPUT DATA IN THE FOLLOWING FORMAT: 10 DATA FLOW(1),. . .,FLOW(N) RUN ADDITIONAL INSTRUCTIONS MAY BE FOUND ON THE LISTING. ANNUIT ------ PURPOSE: TO PERFORM THE CALCULATIONS NECESSARY FOR DETERMINING BOTH PAYMENT AND WITHDRAW@L ANNUITIES. INSTRUCTIONS: SUPPLY VALUES FOR THE TARIABLES AS REQUIRED BY THE PROBLEM, VARIABLES ARE DENOTED AS FOLLOWS: N=NUMBER OF PERIODS P=ORIGINAL PRINCIPAL AMOUNT A=TOTAL AMOUNT AT END OF N PERIODS I=INTEREST RATE PER PERIOD, IN PERCENT R=AMOUNT OF PAYMENT/WITHDRAWAL EACH PERIOD FOR A PAYMENT ANNUITY, YOU MAY GIVE ANY THREE OF N,A,I,R AND FIND THE FOURTH. FOR A WITHDRAWAL ANNUITY, YOU GIVE ANY THREE OF N,P,I,R AND FIND THE FOURTH. FOR LOAN OR MORTGAGE, USE THE WITHDRAWAL ANNUITY OPTION. AFTER EACH CASE, YOU MAY CHOOSE ONE OF THE FOLLOWING ALTERNATIVES: 1=ANOTHER CASE, SAME UNKNOWN VARIABLE 2=ANOTHER CASE, DIFFERENT UNKNOWN 3=ANOTHER CASE, OTHER TYPE OF ANNUITY 4=TOTAL INTEREST PAID OVER N PERIODS 5=TABLE OF WITHDRAWALS, PRINCIPAL, AND INTEREST 6=STOP PROGRAM ADDITIONAL INSTRUCTIONS MAY BE FOUND IN THE LISTING. CPM --- PURPOSE: TO FIND THE CRITICAL PATH(S) IN A NETWORK COMPOSED OF EVENTS INTERCONNECTED BY ACTIVITIES, AND TO COMPUTE PROJECT DURATION AND TOTAL COST. PRIOR TO FINDING THE CRITICAL PATH(S) CHECKS OF THE NETWORK ARE MADE FOR (1) MULTIPLE STARTS, (2) MULTIPLE ENDS, (3) DUPLICATE ACTIVITIES, AND (4) ILLOGICAL LOOPS. INSTRUCTIONS: DATA IS ENTERED IN THE FOLLOWING FORMAT BY ACTIVITIES: 1 DATA I,J,D,A,. . . . .,I(K),J(K),D(K),A(K) (CONTINUE ON LINES 2-999 AS NEEDED) WHERE: I=STARTING EVENT FOR THE ACTIVITY J=ENDING EVENT FOR THE ACTIVITY D=DURATION OF THE ACTIVITY A=COST OF THE ACTIVITY K=NUMBER OF ACTIVITIES IN THE NETWORK ADDITIONAL INFORMATION MAY BE OBTAINED BY LISTING THE PROGRAM CPMEXP. SAVING ------ PURPOSE: TO CALCULATE THE AMOUNT OF MONEY THAT WOULD ACCUMULATE AFTER N YEARS AT AN ANNUAL INTEREST RATE,R COMPOUNDED T TIMES PER YEAR, WHEN THE INITIAL AMOUNT IS P AND AN AMOUNT D IS ADDED AT THE BEGINNING OF EACH SUBSEQUELT YEAR. INSTRUCTIONS: TO USE THIS PROGRAM ENTER THE DATA AS REQUESTED. NOTE: P AND D MUST BE GIVEN IN DOLLARS, N AND T IN INTEGERS, AND R AS A PERCENTAGE, ADDITIONAL INSTRUCTIONS MAY BE FOUND IN THE LISTING. TRUINT ------ PURPOSE: TO CALCULATE THE TRUE ANNUAL INTEREST RATE CHARGED ON AN INSTALLMENT LOAN. INSTRUCTIONS: TO USE THIS PROGRAM SIMPLY SUPPLY VALUES FOR THE FOUR VARIABLES- A=AMOUNT OF LOAN ($) P=AMOUNT OF EACH PAYMENT($( N=THE TOTAL NUMBER OF PAYMENTS DUE K=THE NUMBER OF PAYMENTS DUE IN ONE YEAR ADDHTIONAL INSTRUCTIONS MAY BE FOUND IN THE LISTING. GROWTH ------ PURPOSE: TO CALCULATE GROWTH RATES USING DATA REPRESENTING A NUMBER OF EQUISPACED PERIODS. INSTRUCTIONS: ENTER DATA (XEROES AND NEGATIVE VALUES NOT PERMITTED) ACCORDING TO THE FOLLOWING FORMAT: 10 DATA DATA(1),.,..,DATA(N) 50 DATA I(OPTIONAL...I=3 BUILT-IN) NOTE: THE COMPUTED RATE MAY BE PROJECTED FORWARD FOR N ADDITIONAL PERIODS BY ENTERING DATA AT LINE 50. ADDITIONAL INSTRUCTIONS MAY BE FOUND IN THE LISTING.